“Madzari” – the former Lignite TC, located near the village of Madzari, Skopje. The first two aggression (with power 5.8 meters were released in 1949, and the third (with power 10 meters in 1954. As the first larger TC in the Republic of Macedonia played an important role in the period before the larger HC is built. He stopped working in 1971. Lit: 50 years Macedonian Electric Power Company, Skopje, 1995. Dr. R. Madzirov, Zarko Vangelov
Original article in Macedonian language Cyrillic alphabet
Кириличен напис МАЏАРИ