REK Oslomej.

REK “Oslomej” – a mineral combine in Kicevo. Coal mine – Surface mine, opens in 1955. For public consumption, and in 1977 (1.2 mil.) for a TPP with a power of 125 mies. TEC starts with the construction in 1975, and at work was released in 1980. REK “Oslomej” works as a plant of the former PE ESM, which in 2001 transformed into AD. ESM, and in 2005 in the firm AD. ELEM. The boiler (OB 380) is with a capacity of 380 T / X (Rafaco – a half). The steam turbine (interchange – Poland), type: 13K, is trocilindrical of capacity type with a power of 125 m ear, at 3,000 rpm, steam flow 380 T / X, O 130 bar and 540 C, (PK = 0.09 bar). About 652 workers (2006) work in the complex. REK Oslomej produces 600-700 Guns / g. The chimney is with a height of 180 m. Smades are purified with electrophilster, with a degree of purification 99.5%. Water supply is from the “Studencica” system. For cooling the condenser there is a separate refrigerant with a natural draft, with a height of 64 m, through which 3 17,000 m / x cool water circulate. Fig. A.


Original article in Macedonian language Cyrillic alphabet
Кириличен напис РЕК ОСЛОМЕЈ

Leave a comment

Your email address will not be published. Required fields are marked *