REK “Bitola” – a mining-energy compartment in Suvodol – Bitola. Coal mine – Surface mine (6 mil.t / d.). The thermal power plant is with 3D225 mg power. The construction decision was made in 1975, the construction starts in 1977, and in 1982 it was put into operation and a block, in 1984 ⅱ Block, in 1985, construction, and in 1988, in 1988. is released and ⅲ block. REK “Bitola” works as a propulsion of PE “ESM”. It consists of 3 working units: Mine, TPP and FOD (equipment for equipment and parts). About 3,200 workers work in the plant. Coal (6,180-8,100 kites / kg) is stored at the landfill with a capacity of 560.000 T, which is installed rotobagers with a capacity of 2d 1,200 T / X and 1:2400 T / X. There are transport strips with a capacity of 760 to 1,200 T / X. The 3 blocks in TPP are installed protective steam boilers with a capacity of 660 T / X steam with: 140 bar and O 540 C. There are 2 chimney with a height of 250 m (for and, ⅱ Block) and for ⅲ. The steam turbine is a trocylindrical condensing with a power of 225 m ear, at 3,000 rpm, the steam flow is 628 T / X, 130 bar and 540 C (PK = 0.0642 bar). Technological water has from the accumulation “Strezevo”. The three refrigerant towers are natural draft (height 108 m, 27 000 m 3 / x water). The electrophilter is with a degree of purification 99.85%. TPP “Bitola” works 7000 h / year and the network of $ 7 Wes106 KNC / day electricity. Fig. A. REK Bitola REK Oslomej
Original article in Macedonian language Cyrillic alphabet
Кириличен напис РЕК БИТОЛА