“Negotino” – TC of Mazut, located on the right bank of the river Vardar, near the city of Negotino. It was released in 1978. There is an aggregate with a nominal power of 210 mies. Possible annual production is 1,200 GNG. Due to the relatively high cost of fuel is not used with a large number of hours annually and mainly serves as a reserve source. Lit: 50 years Macedonian Electric Power Company, Skopje, 1995; JP. “Electric Power of Macedonia”, Skopje, 1999; Electric Power of Macedonia, CSO report, 2003. Dr. R. Macariy Negreeze.
Original article in Macedonian language Cyrillic alphabet
Кириличен напис НЕГОТИНО