Mavrovski hydropower plants – a common name for the three HC from the Mavrovo Hydrosystem: HC “Vrben”, HC “Vrutok” and HC “Raven”. The construction of the hydro system began in 1948. and took place in two stages. The first stage lasted until 1960 And in it, it was released in two aggregate in: HC “Vrutok”, HC “Raven” and HC “Vrben”. In the second stage, the third and chat-circuits in Skopje built from “Mavrovo” AD Vreti aggregate in HC “Vrutok” and the third aggregate in HC “Raven”, the supply of the Share waters in the accumulation is also built and the installation is also built of 220 kW at HC “Vrutok”. The large installed capacity of these HC and the possibility of a flexible plant is of particular importance for rational work of the entire EPS. In the period 1992-2003 The average annual production of the three HC was 374.8 GNG, and the greatest was in 1996 and 2002. And it was 520.8 gn. “Vrben” – Flowing HC near the Mavrovo village of Vrben. The drive is from 1959 There are two aggregate with Francis turbines. The installed power is 12.8 m. “Vrutok” – derivation-accumulation HC, in the village of Vrutok, southwest of Gostivar. The first two aggres were released in 1957, and the third and fourth in 1973. Each of the aggregates is with installed capacity of 37.5 mies. Turbines are the type Pelton. “Raven” – Flowing HC in the village of Raven (about 2 km downstream of HC Vrutok). The first two aggress are in a plant since 1959, and the third of 1973. The installed power of each of the aggregates is 6.4 mg. The turbines are of the type of Francis. Lit: 50 years Macedonian Electric Power Company, Skopje, 1995; PE “Electric Power of Macedonia”, Skopje, 1999; Electric Power of Macedonia, Annual Report, 2003; HTTP: //Melm.Mom.m.DR. R.
Original article in Macedonian language Cyrillic alphabet
Кириличен напис МАВРОВСКИ ХИДРОЦЕНТРАЛИ